FE Civil Transportation Eng. practice problems

19 exam-style problems with worked solutions and the FE Reference Handbook page for each. Pick an answer to check it. No account needed.

Q1A roadway has a design speed of 55 mph55 \text{ mph} on a 5%5\% upgrade. Using t=2.5 st = 2.5 \text{ s} and a=11.2 ft/sec2a = 11.2 \text{ ft/sec}^2, what is the stopping sight distance?

Worked solution

Uphill is positive grade, so G=+0.05G = +0.05 and the denominator grows, shortening the braking distance. Reaction distance =1.47×55×2.5=202.1= 1.47 \times 55 \times 2.5 = 202.1 ft. The denominator factor is a/32.2+G=0.3478+0.05=0.3978a/32.2 + G = 0.3478 + 0.05 = 0.3978, so braking =552/(30×0.3978)=3,025/11.93=253.5= 55^2/(30 \times 0.3978) = 3{,}025/11.93 = 253.5 ft. Total SSD =202.1+253.5=455.6≈456= 202.1 + 253.5 = 455.6 \approx 456 ft. The 202 ft choice is the reaction distance only. The 492 ft choice used a level grade (G=0G = 0): 202.1+290=492202.1 + 290 = 492. The 541 ft choice used a downgrade (G=−0.05G = -0.05), wrongly making stopping harder.

  1. Reaction distance:
    dr=1.47×55×2.5=202.1 ftd_r = 1.47 \times 55 \times 2.5 = 202.1 \text{ ft}
  2. Braking distance with G=+0.05G = +0.05:
    db=55230(11.232.2+0.05)=3,02530×0.3978=3,02511.93=253.5 ftd_b = \frac{55^2}{30\left(\dfrac{11.2}{32.2} + 0.05\right)} = \frac{3{,}025}{30 \times 0.3978} = \frac{3{,}025}{11.93} = 253.5 \text{ ft}
  3. Total SSD:
    SSD=202.1+253.5=455.6≈456 ftSSD = 202.1 + 253.5 = 455.6 \approx 456 \text{ ft}

FE Reference Handbook 10.6, p. 306

Q2During the peak hour an approach records 2,400 veh/hr2{,}400 \text{ veh/hr} with a peak 15-minute count of 700 veh700 \text{ veh}. What is the peak hour factor (PHF)?

Worked solution

PHF=V/(4×V15)=2,400/(4×700)=2,400/2,800=0.857PHF = V/(4 \times V_{15}) = 2{,}400/(4 \times 700) = 2{,}400/2{,}800 = 0.857. The 0.292 option divided V15V_{15} by VV and forgot the factor of 4 in the wrong place: 700/2,400=0.292700/2{,}400 = 0.292. The 1.167 option inverted the ratio: 2,800/2,4002{,}800/2{,}400. The 0.750 option used V15=800V_{15} = 800 by mistake. PHF is always between 0.25 and 1.00.

  1. Peak hour factor:
    PHF=V4×V15=2,4004×700=2,4002,800=0.857PHF = \frac{V}{4 \times V_{15}} = \frac{2{,}400}{4 \times 700} = \frac{2{,}400}{2{,}800} = 0.857

FE Reference Handbook 10.6, p. 306

Q3A crest vertical curve must provide a sight distance S=700 ftS = 700 \text{ ft} with A=4A = 4. Determine which case (S≤LS \leq L or S>LS > L) governs and find the minimum curve length.

Worked solution

Test the S≤LS \leq L case first: L=AS2/2,158=4×7002/2,158=1,960,000/2,158=908≈909L = AS^2/2{,}158 = 4 \times 700^2/2{,}158 = 1{,}960{,}000/2{,}158 = 908 \approx 909 ft. Check the assumption: S=700≤L=908S = 700 \leq L = 908 is TRUE, so this branch is valid and governs. Now check the S>LS > L branch: L=2S−2,158/A=1,400−539.5=860.5L = 2S - 2{,}158/A = 1{,}400 - 539.5 = 860.5 ft, which would require S>LS > L (i.e., 700>860.5700 > 860.5) -- that is FALSE, so the S>LS > L branch is invalid here. The minimum length is therefore about 909 ft. The 863 ft choice is approximately the invalid S>LS > L branch value (2S−2,158/A=860.52S - 2{,}158/A = 860.5, rounded). The 1,400 ft choice is just 2S, dropping the second term. The 540 ft choice is the term 2,158/A2{,}158/A alone.

  1. Apply the S≤LS \leq L crest formula:
    L=AS22,158=4×70022,158=1,960,0002,158L = \frac{AS^2}{2{,}158} = \frac{4 \times 700^2}{2{,}158} = \frac{1{,}960{,}000}{2{,}158}
  2. Evaluate and check the assumption (S=700≤LS = 700 \leq L):
    L=908.2≈909 ft(700≤908✓)L = 908.2 \approx 909 \text{ ft} \quad (700 \leq 908 \checkmark)

FE Reference Handbook 10.6, p. 308

Q4A vertical curve is designed with a K-value of K=160K = 160 connecting a −2%-2\% grade to a +3%+3\% grade. What is the required curve length LL?

Worked solution

A=∣g2−g1∣×100=∣0.03−(−0.02)∣×100=0.05×100=5A = |g_2 - g_1| \times 100 = |0.03 - (-0.02)| \times 100 = 0.05 \times 100 = 5. Then K=L/AK = L/A rearranges to L=K×A=160×5=800L = K \times A = 160 \times 5 = 800 ft. The 160 ft choice reported KK as if it were LL. The 32 ft choice computed K/A=160/5K/A = 160/5 instead of K×AK \times A. The 320 ft choice used A=2A = 2 (only one grade magnitude): 160×2160 \times 2.

  1. Algebraic difference:
    A=∣g2−g1∣×100=∣0.03−(−0.02)∣×100=5A = |g_2 - g_1| \times 100 = |0.03 - (-0.02)| \times 100 = 5
  2. Curve length:
    L=K×A=160×5=800 ftL = K \times A = 160 \times 5 = 800 \text{ ft}

FE Reference Handbook 10.6, p. 307

Q5A horizontal curve has R=1,000 ftR = 1{,}000 \text{ ft} and intersection angle I=40°I = 40\degree. What is the middle ordinate MM?

I = 40°RTPCPTPI
Worked solution

M=R[1−cos⁡(I/2)]=1,000[1−cos⁡(20°)]=1,000(1−0.9397)=1,000×0.0603=60.3M = R[1 - \cos(I/2)] = 1{,}000[1 - \cos(20\degree)] = 1{,}000(1 - 0.9397) = 1{,}000 \times 0.0603 = 60.3 ft. The 234 ft choice used cos⁡(I)=cos⁡(40°)=0.766\cos(I) = \cos(40\degree) = 0.766 instead of cos⁡(I/2)\cos(I/2): 1,000(1−0.766)=2341{,}000(1 - 0.766) = 234. The 64.2 ft choice is the external distance E=R[1/cos⁡(I/2)−1]=1,000(1/0.9397−1)=64.2E = R[1/\cos(I/2) - 1] = 1{,}000(1/0.9397 - 1) = 64.2, not the middle ordinate. The 30.2 ft choice halved the correct answer.

  1. Middle ordinate:
    M=R[1−cos⁡ ⁣(I2)]=1,000[1−cos⁡(20°)]M = R\left[1 - \cos\!\left(\frac{I}{2}\right)\right] = 1{,}000\left[1 - \cos(20\degree)\right]
  2. Evaluate:
    M=1,000(1−0.9397)=60.3 ftM = 1{,}000(1 - 0.9397) = 60.3 \text{ ft}

FE Reference Handbook 10.6, p. 309

Q6A curve is designed for V=60 mphV = 60 \text{ mph} with a maximum superelevation e=8%e = 8\% and a side friction factor f=0.12f = 0.12. What is the minimum allowable curve radius?

Worked solution

Rearrange 0.01e+f=V2/(15R)0.01e + f = V^2/(15R) for the minimum radius: R=V2/[15(0.01e+f)]=602/[15(0.08+0.12)]=3,600/[15×0.20]=3,600/3.0=1,200R = V^2/[15(0.01e + f)] = 60^2/[15(0.08 + 0.12)] = 3{,}600/[15 \times 0.20] = 3{,}600/3.0 = 1{,}200 ft. The 2,000 ft option used only friction (0.01e+f=0.120.01e + f = 0.12): 3,600/(15×0.12)=2,0003{,}600/(15 \times 0.12) = 2{,}000. The 240 ft option forgot to convert ee: used 0.01e=0.080.01e = 0.08 but then added e=8e = 8 giving an inflated denominator. The 600 ft option doubled the denominator factor by using 0.01e+f=0.400.01e + f = 0.40.

  1. Rearrange for radius:
    R=V215(0.01e+f)R = \frac{V^2}{15(0.01e + f)}
  2. Substitute:
    R=60215(0.08+0.12)=3,60015×0.20R = \frac{60^2}{15(0.08 + 0.12)} = \frac{3{,}600}{15 \times 0.20}
  3. Evaluate:
    R=3,6003.0=1,200 ftR = \frac{3{,}600}{3.0} = 1{,}200 \text{ ft}

FE Reference Handbook 10.6, p. 309

Q7An intersection approach has a speed of 35 mph35 \text{ mph} on a 4%4\% upgrade. Using t=1.0 st = 1.0 \text{ s} and a=10 ft/sec2a = 10 \text{ ft/sec}^2, what is the yellow interval?

Worked solution

Convert: v=35×1.467=51.3v = 35 \times 1.467 = 51.3 ft/sec. On an upgrade, gravity aids stopping, so the denominator grows: 2a+64.4G=2(10)+64.4(0.04)=20+2.576=22.582a + 64.4G = 2(10) + 64.4(0.04) = 20 + 2.576 = 22.58. y=1.0+51.3/22.58=1.0+2.27=3.27≈3.3y = 1.0 + 51.3/22.58 = 1.0 + 2.27 = 3.27 \approx 3.3 sec. The 3.6 sec option used a level grade (G=0G = 0): 1.0+51.3/20=3.571.0 + 51.3/20 = 3.57. The 3.9 sec option reversed the sign (treated the upgrade as a downgrade): 1.0+51.3/17.42=3.951.0 + 51.3/17.42 = 3.95. The 2.6 sec option used mph in the numerator: 1.0+35/22.58=2.551.0 + 35/22.58 = 2.55.

  1. Convert speed:
    v=35×1.467=51.3 ft/secv = 35 \times 1.467 = 51.3 \text{ ft/sec}
  2. Effective deceleration term (upgrade, +G):
    2a+64.4G=2(10)+64.4(0.04)=20+2.58=22.582a + 64.4G = 2(10) + 64.4(0.04) = 20 + 2.58 = 22.58
  3. Yellow interval:
    y=1.0+51.322.58=1.0+2.27=3.27≈3.3 secy = 1.0 + \frac{51.3}{22.58} = 1.0 + 2.27 = 3.27 \approx 3.3 \text{ sec}

FE Reference Handbook 10.6, p. 306

Q8Two crosswalks have identical lengths and pedestrian speeds, but Crosswalk A serves 5 pedestrians per cycle while Crosswalk B serves 25. Using Gp=3.2+L/Sp+0.27NpedG_p = 3.2 + L/S_p + 0.27 N_{\text{ped}}, how does the required pedestrian green time compare?

Worked solution

The only term that differs between the two crosswalks is 0.27Nped0.27 N_{\text{ped}}. The difference in that term is 0.27(25−5)=0.27×20=5.40.27(25 - 5) = 0.27 \times 20 = 5.4 sec, so B needs about 5.4 sec more. The start-up constant (3.2) and the walking time (L/SpL/S_p) are identical for both. The option that they are equal because the walking time term L/SpL/S_p dominates the calculation is wrong because the volume term, while smaller, is not zero. The option that Crosswalk B requires 5 times the green time of Crosswalk A wrongly assumes green time scales linearly with pedestrian count -- only one of three terms depends on NpedN_{\text{ped}}. The option that Crosswalk A requires more green time because fewer pedestrians walk more cautiously invents a behavior not in the formula.

  1. Identical terms: 3.2+L/Sp3.2 + L/S_p are the same for both crosswalks.
  2. Difference comes only from the volume term:
    ΔGp=0.27(NB−NA)=0.27(25−5)=5.4 sec\Delta G_p = 0.27(N_B - N_A) = 0.27(25 - 5) = 5.4 \text{ sec}
  3. Crosswalk B requires about 5.4 sec more green time.

FE Reference Handbook 10.6, p. 306

Q9A roadway has free-flow speed Sf=50 mphS_f = 50 \text{ mph} and jam density Dj=160 veh/mi/lnD_j = 160 \text{ veh/mi/ln}. Using the Greenshields model, what is the flow when the density is D=40 veh/mi/lnD = 40 \text{ veh/mi/ln}?

Worked solution

First find speed from Greenshields: S=Sf−(Sf/Dj)D=50−(50/160)(40)=50−0.3125×40=50−12.5=37.5S = S_f - (S_f/D_j)D = 50 - (50/160)(40) = 50 - 0.3125 \times 40 = 50 - 12.5 = 37.5 mph. Then flow V=S×D=37.5×40=1,500V = S \times D = 37.5 \times 40 = 1{,}500 veh/hr/ln. The 2,000 veh/hr/ln choice used the free-flow speed without the density reduction: 50×40=2,00050 \times 40 = 2{,}000. The 1,000 veh/hr/ln choice used the optimum speed Sf/2=25S_f/2 = 25: 25×4025 \times 40. The 500 veh/hr/ln choice used only the speed-reduction term (12.5×4012.5 \times 40) as the speed.

  1. Speed at D=40D = 40:
    S=50−50160(40)=50−12.5=37.5 mphS = 50 - \frac{50}{160}(40) = 50 - 12.5 = 37.5 \text{ mph}
  2. Flow:
    V=S×D=37.5×40=1,500 veh/hr/lnV = S \times D = 37.5 \times 40 = 1{,}500 \text{ veh/hr/ln}

FE Reference Handbook 10.6, p. 312

Q10A 3 mile3 \text{ mile} rural highway segment carries an ADT of 5,000 veh/day5{,}000 \text{ veh/day} and recorded 27 crashes over a 5-year study period. What is the crash rate per hundred million vehicle-miles traveled (per 100 MVM)?

Worked solution

VMT=ADT×days×length=5,000×(365×5)×3=5,000×1,825×3=27,375,000VMT = ADT \times \text{days} \times \text{length} = 5{,}000 \times (365 \times 5) \times 3 = 5{,}000 \times 1{,}825 \times 3 = 27{,}375{,}000 vehicle-miles. Rate per 100 million VM =A×100,000,000/VMT=27×100,000,000/27,375,000=98.6= A \times 100{,}000{,}000/VMT = 27 \times 100{,}000{,}000/27{,}375{,}000 = 98.6. The 0.99 choice used the per-one-million factor instead of per hundred million: 27×1,000,000/27,375,00027 \times 1{,}000{,}000/27{,}375{,}000. The 32.9 choice is the correct rate divided by 3 (e.g., counting the 3-mile length twice in the VMT). The 493 choice used only 1 year instead of the 5-year study period, dividing the VMT by 5 and raising the rate fivefold (98.6×5≈49398.6 \times 5 \approx 493).

  1. Vehicle-miles traveled over 5 years:
    VMT=5,000×(365×5)×3=27,375,000VMT = 5{,}000 \times (365 \times 5) \times 3 = 27{,}375{,}000
  2. Crash rate per 100 million VM:
    R=27×100,000,00027,375,000=98.6R = \frac{27 \times 100{,}000{,}000}{27{,}375{,}000} = 98.6

FE Reference Handbook 10.6, p. 313

Q11A freeway carries 20%20\% trucks (PT=0.20P_T = 0.20) on rolling terrain (ET=3.0E_T = 3.0). What is the heavy-vehicle adjustment factor fHVf_{HV}?

Worked solution

fHV=1/[1+PT(ET−1)]=1/[1+0.20(3.0−1)]=1/[1+0.20×2]=1/1.40=0.714f_{HV} = 1/[1 + P_T(E_T - 1)] = 1/[1 + 0.20(3.0 - 1)] = 1/[1 + 0.20 \times 2] = 1/1.40 = 0.714. The 0.625 distractor used ET=3.0E_T = 3.0 without subtracting 1: 1/[1+0.20×3]=1/1.601/[1 + 0.20 \times 3] = 1/1.60. The 1.400 distractor reported the denominator itself instead of its reciprocal. The 0.600 distractor computed 1−PT×ET=1−0.601 - P_T \times E_T = 1 - 0.60.

  1. Heavy-vehicle factor:
    fHV=11+PT(ET−1)=11+0.20(3.0−1)f_{HV} = \frac{1}{1 + P_T(E_T - 1)} = \frac{1}{1 + 0.20(3.0 - 1)}
  2. Evaluate:
    fHV=11+0.40=11.40=0.714f_{HV} = \frac{1}{1 + 0.40} = \frac{1}{1.40} = 0.714

FE Reference Handbook 10.6, p. 311

Q12Two freeway segments are analyzed. Segment 1 has a density of 24 pc/mi/ln24 \text{ pc/mi/ln} and Segment 2 has a density of 40 pc/mi/ln40 \text{ pc/mi/ln}. Using the LOS density boundaries (A ≤11\leq 11, B >11> 11–18, C >18> 18–26, D >26> 26–35, E >35> 35–45, F >45> 45), which statement is correct?

Worked solution

LOS is read directly from density. Segment 1 at 24 pc/mi/ln falls in the >18> 18 to 26 band, which is LOS C. Segment 2 at 40 pc/mi/ln falls in the >35> 35 to 45 band, which is LOS E. The 'LOS B / LOS D' choice shifts both grades one letter too good. The 'both at LOS D' choice wrongly lumps both into D. The 'LOS C / LOS F' choice pushes Segment 2 to F, but F only begins above 45 pc/mi/ln.

  1. Segment 1: 24 pc/mi/ln is in the >18> 18 to 26 band.
  2. That band is LOS C.
  3. Segment 2: 40 pc/mi/ln is in the >35> 35 to 45 band, which is LOS E.

FE Reference Handbook 10.6, p. 311

Q13A flexible pavement must provide SN=5.0SN = 5.0. The base has a2=0.14a_2 = 0.14, D2=10 inD_2 = 10 \text{ in}, m2=1.0m_2 = 1.0; the subbase has a3=0.12a_3 = 0.12, D3=8 inD_3 = 8 \text{ in}, m3=1.0m_3 = 1.0. The asphalt surface has a1=0.44a_1 = 0.44. What minimum surface thickness D1D_1 is required?

Worked solution

Base contribution: 0.14×10×1.0=1.400.14 \times 10 \times 1.0 = 1.40. Subbase: 0.12×8×1.0=0.960.12 \times 8 \times 1.0 = 0.96. Remaining SN for the surface: 5.0−1.40−0.96=2.645.0 - 1.40 - 0.96 = 2.64. Then D1=2.64/a1=2.64/0.44=6.0D_1 = 2.64/a_1 = 2.64/0.44 = 6.0 in. The 11.4-in choice solved D1=5.0/0.44D_1 = 5.0/0.44 without subtracting the lower layers. The 2.6-in choice left the remaining SN of 2.64 as a thickness, forgetting to divide by a1a_1. The 7.7-in choice forgot the subbase, dividing 5.0−1.40=3.605.0 - 1.40 = 3.60 by 0.44×1.060.44 \times 1.06.

  1. Base contribution:
    a2D2m2=0.14×10×1.0=1.40a_2 D_2 m_2 = 0.14 \times 10 \times 1.0 = 1.40
  2. Subbase contribution:
    a3D3m3=0.12×8×1.0=0.96a_3 D_3 m_3 = 0.12 \times 8 \times 1.0 = 0.96
  3. Surface thickness:
    D1=5.0−1.40−0.960.44=2.640.44=6.0 inD_1 = \frac{5.0 - 1.40 - 0.96}{0.44} = \frac{2.64}{0.44} = 6.0 \text{ in}

FE Reference Handbook 10.6, p. 314

Q14A pavement carries 300 passes/day of an 18,000 lb18{,}000 \text{ lb} single axle (LEF =1.00= 1.00) and 150 passes/day of a 30,000 lb30{,}000 \text{ lb} single axle (LEF =7.9= 7.9). Over a 20-year design life at 365 days/year, what is the total design ESALs?

Worked solution

Daily ESALs =300(1.00)+150(7.9)=300+1,185=1,485= 300(1.00) + 150(7.9) = 300 + 1{,}185 = 1{,}485 ESALs/day. Over the design life: 1,485×365×20=1,485×7,300=10,840,500≈10.8×1061{,}485 \times 365 \times 20 = 1{,}485 \times 7{,}300 = 10{,}840{,}500 \approx 10.8 \times 10^6 ESALs. The 2.2×1062.2 \times 10^6 choice counted only the 18-kip axles over the design life: 300×7,300=2.19×106300 \times 7{,}300 = 2.19 \times 10^6. The 8.7×1068.7 \times 10^6 choice used the heavy axles only: 1,185×7,300=8.65×1061{,}185 \times 7{,}300 = 8.65 \times 10^6. The 0.54×1060.54 \times 10^6 choice forgot to multiply by the 20-year life and used only 365 days: 1,485×365=542,0251{,}485 \times 365 = 542{,}025.

  1. Daily ESALs:
    300(1.00)+150(7.9)=300+1,185=1,485 ESALs/day300(1.00) + 150(7.9) = 300 + 1{,}185 = 1{,}485 \text{ ESALs/day}
  2. Total over the design life:
    1,485×365×20=1,485×7,300=10,840,5001{,}485 \times 365 \times 20 = 1{,}485 \times 7{,}300 = 10{,}840{,}500
  3. Rounded:
    ≈10.8×106 ESALs\approx 10.8 \times 10^6 \text{ ESALs}

FE Reference Handbook 10.6, p. 314

Q15An embankment requires 9,000 yd39{,}000 \text{ yd}^3 of compacted fill. The borrow soil has a shrinkage factor such that compacted volume is 0.90 times the bank (in-place) volume. How many cubic yards of bank material must be excavated from the borrow pit?

Worked solution

Compacted volume =0.90×= 0.90 \times bank volume, so bank volume == compacted volume /0.90=9,000/0.90=10,000/ 0.90 = 9{,}000/0.90 = 10{,}000 yd^3. Soil shrinks when compacted, so you must dig MORE bank material than the finished fill volume. The 8,100 yd^3 option multiplied by 0.90 instead of dividing: 9,000×0.909{,}000 \times 0.90. The 9,000 yd^3 option ignored shrinkage entirely. The 9,900 yd^3 option added 10% instead of dividing by 0.90.

  1. Relationship:
    Vcompacted=0.90×VbankV_{\text{compacted}} = 0.90 \times V_{\text{bank}}
  2. Solve for bank volume:
    Vbank=9,0000.90=10,000 yd3V_{\text{bank}} = \frac{9{,}000}{0.90} = 10{,}000 \text{ yd}^3

FE Reference Handbook 10.6, p. 315

Q16Three stations are spaced 100 ft100 \text{ ft} apart. The cross-sectional areas are A1=120 ft2A_1 = 120 \text{ ft}^2, A2=200 ft2A_2 = 200 \text{ ft}^2, and A3=160 ft2A_3 = 160 \text{ ft}^2. Using the average end area method between consecutive stations, what is the total earthwork volume?

Worked solution

Apply the average end area method to each 100-ft span and add. Span 1 (A1A_1 to A2A_2): V=100(120+200)/2=16,000V = 100(120 + 200)/2 = 16{,}000 ft^3. Span 2 (A2A_2 to A3A_3): V=100(200+160)/2=18,000V = 100(200 + 160)/2 = 18{,}000 ft^3. Total =34,000= 34{,}000 ft^3, then 34,000/27=1,25934{,}000/27 = 1{,}259 yd^3. The 1,037 yd^3 distractor collapsed the two spans into a single 200-ft span using only the first and last areas: 200(120+160)/2=28,000200(120 + 160)/2 = 28{,}000 ft^3 →1,037\to 1{,}037 yd^3. The 1,333 yd^3 distractor wrongly applied the prismoidal formula treating A2A_2 as a mid-section: 200(120+4×200+160)/6=36,000200(120 + 4 \times 200 + 160)/6 = 36{,}000 ft^3 →1,333\to 1{,}333 yd^3. The 593 yd^3 distractor used only the first span.

  1. Span 1 to 2:
    V12=100(120+200)2=16,000 ft3V_{12} = \frac{100(120 + 200)}{2} = 16{,}000 \text{ ft}^3
  2. Span 2 to 3:
    V23=100(200+160)2=18,000 ft3V_{23} = \frac{100(200 + 160)}{2} = 18{,}000 \text{ ft}^3
  3. Total and convert:
    V=16,000+18,00027=34,00027=1,259 yd3V = \frac{16{,}000 + 18{,}000}{27} = \frac{34{,}000}{27} = 1{,}259 \text{ yd}^3

FE Reference Handbook 10.6, p. 315

Q17A zone produces Pi=800P_i = 800 trips, distributed to two zones with weights A1F1=120A_1 F_1 = 120 and A2F2=80A_2 F_2 = 80 (K = 1). How many trips go to the first zone?

A₁, F₁A₂, F₂Zone iPᵢ tripsZone 1Zone 2
Worked solution

Fraction to zone 1 = 120/(120 + 80) = 120/200 = 0.60, so T = 800 × 0.60 = 480 trips. The 320 trips choice is the trips to zone 2 (80/200 × 800). The 400 trips choice splits evenly. The 120 trips choice reports the raw weight, not the trips.

  1. Fraction to zone 1:
    120120+80=0.60\frac{120}{120 + 80} = 0.60
  2. Trips:
    T=800×0.60=480 tripsT = 800 \times 0.60 = 480\text{ trips}

FE Reference Handbook 10.6, p. 312

Q18Which design parameter is used to characterize foundation support specifically in RIGID pavement design?

subgradeslabjointdowel barload
Worked solution

Rigid pavement design uses the modulus of subgrade reaction k (pressure per unit deflection) to describe how the subgrade supports the slab. The structural number (SN) is for flexible pavement; Marshall stability and penetration grade are asphalt-mix and binder properties.

  1. Rigid pavement rests on the subgrade as a slab.
  2. Subgrade support is measured by the modulus of subgrade reaction k.
  3. The structural number applies to flexible pavement instead.

Q19An engineer finds that an intersection does not meet any MUTCD signal warrant. What is the appropriate conclusion?

Worked solution

If no warrant is met, a signal is not justified, because installing one can increase rear-end crashes and cause unnecessary delay. The "install anyway" option wrongly assumes signals always help. The claim that warrants do not apply to existing intersections is false (warrants apply broadly). The "a signal must be installed" option inverts the purpose of a warrant analysis.

  1. No warrant met means conditions do not justify a signal.
  2. Unwarranted signals can increase crashes and delay.
  3. So a signal should not be installed.

FE Reference Handbook 10.6, MUTCD, Traffic Signal Warrants

19 problems. Your score shows here as you go.

New to Transportation Eng.? Start with the FE Civil Transportation Eng. study guide: what NCEES tests, the key formulas, and the mistakes that cost points.

1,435 more problems like these, completely free

These are 19 of 1,454 problems across all 15 FE Civil chapters, with lessons and progress that remembers what you missed.

Create your free account